Loup Loup Ski Area Summer Activity Report June 16th

One of the holes for one of the 2 large tanks for the septic system is cut and ready for concrete forms. The building site is almost ready for concrete forms, but a few more conduits need to be run. The second hole for the second of the 2 big tanks has located and started, and more sand has arrived for the drain fields.

Now that we have holes ready, we are starting our concrete work. Everyday we will need a laborer to help our concrete expert. A willingness to help is all that is required for this important phase. We continue to need dump trucks to haul materials up from Okanogan and Winthrop (450 yards of sand from Okanogan!).

A Big “Thanks” for help or materials for the past week goes out to: Mike Pruett, Badger Excavation, North valley Lumber, Valley Lumber, Cascade Concrete, and Okanogan Valley Concrete.

For more information, contact your local LLSEF Board Member.